The first order packages were booked in October and November and included several production mask aligners and coat/bake/develop clusters for 200 and 300mm, which will be installed at ASE’s wafer level packaging and redistribution process facility in Kaohsiung, Taiwan.
(November 20, 2007) SAN JOSE, CA — SEMI today reported that worldwide semiconductor manufacturing equipment billings reached $11.13 B in 3Q07. The billings figure is one percent greater than 2Q07 and about one percent greater than the same quarter a year ago.